Training Analisis Network Planning Dengan Cpm (Critical Path Methode) dan Program Evaluation Review and Technique (PERT) Dalam Rangka Efisiensi Waktu Dan Biaya Proyek
Training Analysis of Network Planning With Cpm (Critical Path Method) and Program Evaluation and Review Technique (PERT) in the Context of Time And Cost Efficiency Project
Description Training Analysis of Network Planning With Cpm
The impact of the financial crisis until today still strongly felt by the nation of Indonesia. Various increasingly complex problems on the economy in Indonesia is becoming increasingly unstable. It pushes each company to further increase the potential resources that are owned by the existing technology fitted, so that the company can survive in the competition, both regionally, nationally, and globally.
Companies that can not compete will defeat or decline, even many companies that exist in Indonesia have gone bankrupt. This is because these companies are not able to compete in a variety of ways, which include competing in time and production costs. In relation to the time and cost of production, the company must be efficient in the use of time in a project, it needed a project management.
To assist in planning the project completion can apply analytics Network. In addition, the Network with the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) can also be used as a surveillance tool which is good enough for the completion of the project.
CPM is oriented methods that lead to the determination of the time schedule and the estimated time is diterministik / Sure. While PERT is a method that is oriented in the time leading up to the determination of the schedule and the time is probabilistic / possibilities.
Aim
After this training, participants are expected to control the coordination of activities in a job so that the project can be completed within an appropriate period can also help companies to conduct planning and controlling projects with more time and cost efficient.
Training Content Analysis of Network Planning With Cpm
1. The scope of the Project
Project Management
Structure Work Solving
Project Scheduling
Setup Project
2. Project Management:
Planning
Scheduling
Control
Decision
3. Critical Path Method Critical-Path Method (CPM)
4. Cost and Time acceleration of project support
5. Analysis of direct and indirect costs
6. Program Evaluation and ReviewTechnique (PERT)
participant
Participants can be followed by all those interested in this field. It can also be followed by all who want to move on and learn more on this field.
instructor
Instructor in Training and Training will be hosted by an expert in this field.
Method
1. Presentation
2. Discussion among participants
3. Case studies
4. Simulation
5. Evaluation
6. Consultation with instructor
Jadwal Pelatihan Lokal Media Training 2021 :
5-7 Januari 2021 | 19-21 Januari 2021 | 26-28 Januari 2021
9-10 Februari 2021 | 23-25 Februari 2021
9-11 Maret 2021 | 23-25 Maret 2021
6-8 April 2021 | 20-22 April 2021 | 27-29 April 2021
4-6 Mei 2021 | 11-13 Mei 2021 | 18-20 Mei 2021 | 25-27 Mei 2021
8-10 Juni 2021 | 22-24 Juni 2021
13-15 Juli 2021 | 20-22 Juli 2021
3-5 Agustus 2021 | 24-26 Agustus 2021
7-9 September 2021 | 21-23 September 2021
5-7 Oktober 2021 | 19-21 Oktober 2021
9-11 November 2021 | 23-25 November 2021
7-9 Desember 2021 | 14-16 Desember 2021 | 21-23 Desember 2021
Jadwal Pelatihan Lokal Media Training 2022 :
18 – 20 Januari 2022 | 25 – 27 Januari 2022
8 – 10 Februari 2022 | 15 – 17 Februari 2022 | 22 – 24 Februari 2022
2 – 4 Maret 2022 | 8 – 10 Maret 2022 | 15 – 17 Maret 2022 | 22 – 24 Maret 2022 | 29 – 31 Maret 2022
5 – 7 April 2022 | 19 – 21 April 2022
10 -12 Mei 2022 | 17 – 19 Mei 2022 | 24 – 26 Mei 2022
7 – 9 Juni 2022 | 14 – 16 Juni 2022 | 21 – 23 Juni 2022 | 28 – 30 Juni 2022
5 – 7 Juli 2022 | 12 – 14 Juli 2022 | 26 – 28 Juli 2022
2 – 4 Agustus 2022 | 9 – 11 Agustus 2022 | 23 – 25 Agustus 2022
6 – 8 September 2022 | 13 – 15 September 2022 | 20 – 22 September 2022 | 27 – 29 September 2022
4 – 6 Oktober 2022 | 11 – 13 Oktober 2022 | 18 – 20 Oktober 2022 | 25 – 27 Oktober 2022
1 – 3 November 2022 | 8 – 10 November 2022 | 15 – 17 November 2022 | 22 – 24 November 2022
6 – 8 Desember 2022 | 13 – 15 Desember 2022 | 20 – 22 Desember 2022 | 27 – 29 Desember 2022
TEMPAT PELAKSANAAN PELATIHAN
- REGULER TRAINING
- YOGYAKARTA
- JAKARTA
- BANDUNG
- MALANG
- SURABAYA
- BALI
- LOMBOK – NTB
- IN HOUSE TRAINING
- ONLINE TRAINING VIA ZOOM
Note :
Waktu dan tempat pelaksanaan pelatihan bisa kami sesuaikan dengan kebutuhan peserta.
Investasi Pelatihan Lokal Media Training:
- Investasipelatihan selama tiga hari tersebut menyesuaikan dengan jumlah peserta
- Apabila perusahaan membutuhkan paket in house training, anggaran investasi pelatihan dapat menyesuaikan dengan anggaran perusahaan.
Fasilitas Pelatihan di Lokal Media Training:
- FREE Airport pickup service (Gratis Antar jemput Hotel/Bandara)
- FREE Akomodasi ke tempat pelatihan bagi peserta
- Module / Handout
- FREE Flashdisk
- Sertifikat
- FREE Bag or bagpackers (Tas Training)
- Training Kit (Dokumentasi photo, Blocknote, ATK, etc)
- 2xCoffe Break & 1 Lunch, Dinner
- FREE Souvenir Exclusive
- Training room full AC and Multimedia